• Home
  • Shop
    • Shop
    • Rail & Welding Materials
      • Rail & Welding Materials
      • Show all from Rail & Welding Materials
      • Rail
      • Welding Materials
    • Sleepers
      • Sleepers
      • Show all from Sleepers
      • Sleepers & Turnout Sleepers
      • Mounting Materials
    • Level Crossings
      • Level Crossings
      • Show all from Level Crossings
      • Flooring
      • Other Level Crossing Products
    • Ballast
      • Ballast
      • Show all from Ballast
      • Ballast in big bags
      • Ballast per tonne
    • Switch & Turnout Materials
      • Switch & Turnout Materials
      • Show all from Switch & Turnout Materials
      • Frogs
      • Double Frogs
      • Expansion Joints
      • Bridge Transitions
      • Buffer Stops
      • Point Machines
    • Underground Cabling
      • Underground Cabling
      • Show all from Underground Cabling
      • Casings & Tubes
      • Mounting Materials
    • Train Control Systems
      • Train Control Systems
      • Show all from Train Control Systems
      • Security Systems
    • Catenary
      • Catenary
      • Show all from Catenary
      • Third Rail
    • Service Products
      • Service Products
      • Show all from Service Products
      • Screws, Nuts & Bolts
      • Maintenance Products
      • Cleaning
      • Tools & Machines
    • Collectables
  • Railstock
  • Re-used products
  • Urban Transportation
  • Login / Register

Menu

Close

  • My shopping cart
  • Your shopping cart is empty.
  • Back to shopping
EN_GB EN
  • NL NL
  • EN EN
  • DE DE
  • News
  • About us
  • Opportunities
  • Contact
  • EN_GB EN
    • NL NL
    • EN EN
    • DE DE
  • My shopping cart
  • Your shopping cart is empty.
  • Back to shopping
EN_GB EN
  • NL NL
  • EN EN
  • DE DE
  • Home
  • Shop
          Rail & Welding Materials
        • Rail
        • Welding Materials
          Sleepers
        • Mounting Materials
        • Sleepers & Turnout Sleepers
          Level Crossings
        • Flooring
        • Other Level Crossing Products
          Ballast
        • Ballast in big bags
        • Ballast per tonne
          Switch & Turnout Materials
        • Bridge Transitions
        • Buffer Stops
        • Double Frogs
        • Expansion Joints
        • Frogs
        • Point Machines
          Underground Cabling
        • Casings & Tubes
        • Mounting Materials
          Train Control Systems
        • Security Systems
          Catenary
        • Third Rail
          Service Products
        • Cleaning
        • Maintenance Products
        • Screws, Nuts & Bolts
        • Tools & Machines
          Collectables
  • Railstock
  • Re-used products
  • Urban Transportation
  • SIGNALING
  • +31 (0)35 - 688 96 00
  1. Home
  2. Nieuws
General news
Blogs
Customer story
In the media
Product news
Bovenbouwvernieuwing Weert succesvol verlopen: zorgvuldige afstemming zorgt voor efficiënte uitvoering project
01-06-23

Bovenbouwvernieuwing Weert succesvol verlopen: zorgvuldige afstemming zorgt voor efficiënte uitvoering project

In de wereld van de railinfra is het niet ongewoon om grote projecten uit te voeren die dagen, weken of zelfs maanden duren. Een van de uitdagendste aspecten van deze projecten is het vinden van manieren om alle verschillende stappen en taken die nodig zijn om het project te voltooien, efficiënt en op de juiste tijd te organiseren. Voor een bovenbouwvernieuwing (BBV) in Weert hebben wij in nauwe samenwerking met Strukton Rail een gedetailleerd logistiek plan voor de uitwisseling van de betonnen liggers uitgewerkt.

Read More
Met Zero Waste naar een duurzaam en circulair spoor
25-05-23

Met Zero Waste naar een duurzaam en circulair spoor

Een van de middelen om een bijdrage te leveren aan duurzaamheidsdoelstellingen in de railinfrabranche is het aanpakken van de verpakkingen. ‘Zero Waste’ – letterlijk het wegnemen van de afvalstromen - zorgt voor minder vervuiling en is een belangrijke pijler op weg naar een duurzaam en circulair spoor in 2030. Samen met Strukton Rail hebben wij de handen ineen geslagen om de railinfra richting 2030 verpakkingsvrij te maken.

Read More
Bovenbouwvernieuwing Weert succesvol verlopen: zorgvuldige afstemming zorgt voor efficiënte uitvoering project
01-06-23

Bovenbouwvernieuwing Weert succesvol verlopen: zorgvuldige afstemming zorgt voor efficiënte uitvoering project

In de wereld van de railinfra is het niet ongewoon om grote projecten uit te voeren die dagen, weken of zelfs maanden duren. Een van de uitdagendste aspecten van deze projecten is het vinden van manieren om alle verschillende stappen en taken die nodig zijn om het project te voltooien, efficiënt en op de juiste tijd te organiseren. Voor een bovenbouwvernieuwing (BBV) in Weert hebben wij in nauwe samenwerking met Strukton Rail een gedetailleerd logistiek plan voor de uitwisseling van de betonnen liggers uitgewerkt.

Read More
Met Zero Waste naar een duurzaam en circulair spoor
25-05-23

Met Zero Waste naar een duurzaam en circulair spoor

Een van de middelen om een bijdrage te leveren aan duurzaamheidsdoelstellingen in de railinfrabranche is het aanpakken van de verpakkingen. ‘Zero Waste’ – letterlijk het wegnemen van de afvalstromen - zorgt voor minder vervuiling en is een belangrijke pijler op weg naar een duurzaam en circulair spoor in 2030. Samen met Strukton Rail hebben wij de handen ineen geslagen om de railinfra richting 2030 verpakkingsvrij te maken.

Read More
09-12-22
Categorisation of the installed base as part of a strategic maintenance concept
17-11-22
Logistics customization offers light rail contractor more efficiency
03-11-22
The Smart Helmet is an advantage to digitalizing quality checks in the railway infrastructure
17-10-22
Inquiries now also available online
19-09-22
InnoTrans 2022: Here we come!
08-09-22
How we translate B2C e-commerce experience to B2B success
01-09-22
The NRG insulated rail joint: an effective weapon against malfunctions inside the tracks
26-08-22
Cable trough: recyclable plastic versus concrete
03-08-22
voestalpine travel tip! 5 sunny railway routes you have to see!
29-06-22
RailTech Europe 2022: solid talks about shared ambitions
26-04-22
Meet our crew: Eric Brink, from Team Lead Quality Assurance Products to BU Manager Rail Services
07-04-22
Digitalization: an impersonal future?
23-03-22
The future of the hyperloop: what does this mean for the rail infrastructure?
17-02-22
European Hyperloop Week is coming to Hilversum, the Netherlands!
10-02-22
Stronger together: a circular railway starts with all of us
03-02-22
RailLight: the bright spot in the rail infrastructure
27-01-22
Meet Our Crew: Nynke Schaap, Export Manager
20-01-22
Conversion service: more than just exchanging materials
13-01-22
The crisis of raw materials: “There are no unexpected surprises for customers when you align the supply and demand”
21-12-21
Recyclable plastic cable troughs: a preferred and more sustainable alternative for concrete
16-12-21
The DeltaSwitch: an ingenious piece of innovation
23-11-21
Our Insulated Rail Joint Repair System; the American Dream!
04-11-21
Our wagon fleet also internationally deployable!
07-09-21
Coating production line re-opened: 360 meters of coated rails
02-09-21
How to protect coated rails when placed in the tracks at level crossings?
27-08-21
Breaking news: Our international web shop is live!
22-07-21
voestalpine travel tip! 5 impressive must-see railway routes
19-07-21
New name, same brand – voestalpine Railpro is now voestalpine Track Solutions Netherlands B.V.
19-07-21
Meet us at this year’s RailTech Europe
19-07-21
More efficiency in the logistics of rail ballast transport
19-07-21
Recap of the RailTech Europe Live with our CEO
19-07-21
Another successful test with our dust suppressing ballast train in Germany
19-07-21
A greener railway while reducing our environmental impact
28-06-21
DeltaSwitch enhances lifespan of switch blades due to reduction in wear
23-06-21
Connecting the world of rail with all our welds
18-02-21
Rubber coating stops deterioration of the rail due to snow residue and road salt
04-11-20
Goodbye to trespassers; the anti-trespass panel goes off-track
23-10-20
Higher level NRG-joints on lower level rails
27-05-20
Forward stocking proves to be a success formula
21-04-20
Railpro anti-trespass panels - successfully placed in Belgium!
16-04-20
SALT-III is the future
03-04-20
Product acceptance IRJ repair system: long-term end post enhancements now also possible in Britain
05-09-19
Performance analysis coated rails Eurotunnel
26-06-19
How does your stomach ache influence the quality of rails?
13-06-18
voestalpine travel tip! – High Line Park, New York
13-07-17
Fixstop OK succesfully installed by Dutch railway operator Dura Vermeer Railinfra
13-02-17
High-performance milling factory in the Netherlands extends network lifespan

Filter

Products

  • Rail & Welding Materials
  • Sleepers
  • Level Crossings
  • Ballast
  • Switch & Turnout Materials
  • Underground Cabling
  • Train Control Systems
  • Catenary
  • Service Products
  • Collectables

Customer service

  • Terms & Conditions
  • Privacyverklaring
  • Productflyers
  • Manuals & Supporting Documentation
  • voestalpine Code of Conduct
  • File a Complaint
  • Returns & RMA
  • Sign up to our Newsletter
  • Disclaimer
  • Prijslijst inname ETM
Customer service
  • Customer service
  • Veelgestelde vragen
  • Contact
  • Downloads
  • Returns
  • Disclaimer
  • Terms and condition
Products
  • Spoorstaven & Lasmiddelen
  • Sleepers
  • Steenslag
  • Turnouts/switches
  • Underground cable management
  • Train control systems
  • Catenary
  • Service products
  • +31 (0)35 - 688 96 00
  • Outage
  • railinfo@railpro.nl

About voestalpine Track Solutions

Always the right material, Just in Time delivered. We support the railway infrastructure with reliability, sustainability and innovation.

Read more

+31 (0)35 - 688 96 00 Outage info-tsnl@voestalpine.com
© 2023 voestalpine Track Solutions Netherlands All rights reserved
  • News
  • About us
  • Opportunities
  • Contact
© 2023 voestalpine Track Solutions Netherlands All rights reserved

My Account

Forgotten your password?

No account yet? Create an account

Back to top