Due to its innovative adjustments, the eNeRGy (or NRG) insulated rail joint could very well be considered the best among all insulated rail joints. Up until 2016, Insulated Rail Joints (IRJs) were in the top three of most frequent malfunctioning assets. A thorn in the side of infrastructure manager ProRail, since providing maximum track availability is one of its top priorities. ProRail sought help and advice from the railway market, and called for the development. A challenge we were happy to accept.
After an intensive development trajectory and the execution of the toughest functionality tests, the latest generation IRJ was launched into the market in Autumn 2016. Since then, approximately 12,000 NRG-joints were installed in the Dutch railway infrastructure. We delivered upon the predicted promise of an interference-free IRJ. An outstandingresult and a perfect example of One Step Ahead in the area of product innovation.
Higher level NRG-joints on lower level rails
Our Insulated Rail Joint Repair System; the American Dream!